Pallet for gang tooling

Has anyone on here ever built a pallet system or fixture plate for the gang tooling portion of the bed on the 15L? I have several different set ups for the gang tooling and I’m thinking of developing a quick change set up that locates on a fixture plate similar to the Saunders plate on my mill. I’m just wondering if anyone has already been here and has any tips.

I have talked to customers that have multiple gang plates and swap the entire plate out for various setups. I’m not sure if that is applicable to your setup or not.